• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
  • Advertise
  • Subscribe

Pneumatic Tips

Tips, Trends, Resources, News and Information

  • Blog
  • Industry News
  • Air Preparation
  • Engineering Basics
  • Components
    • Actuators
    • Cylinders
    • Fittings
    • Gears
    • Grippers
    • Pumps
    • Air Compressors
    • Tubing
    • Vacuums
    • Valves
  • Pressure Sensing
  • Design Guide Library
  • Classrooms
    • Pneumatics Classroom
You are here: Home / Components / How Suppliers Improve Quality and Reliability

How Suppliers Improve Quality and Reliability

February 5, 2009 By Pneumatics Editor

Share

Most vendors have ongoing efforts to improve reliability of the pneumatic components they offer, with the goal of providing long, trouble-free service to users.  So while the reliability standards discussed above show promise for the future, efforts are underway now to improve the pneumatics you can specify today.  Here are some of the programs we’ve seen that impress us; we recognize that many other suppliers have similar programs.


Festo: Pneumatics offer reliability backed by long-term testing. This guarantees millions of operating cycles for valves and valve terminals, and thousands of kilometers of running distance, for example, with standard cylinders.  Before the products of any series leave the factory, they must pass long-term functional and endurance tests, both during the development phase and in all phases of the product life cycle.


Festo10002p32.gif


Festo testing results include data on their “Millionaires’ Club,” with, for example, valves that have completed over 1,000 million switching cycles or cylinders that have covered a running distance of over 45,000 km.



In endurance testing, daily functional checks are carried out by acoustic, visual, and tactile means. Leakage rates, characteristic pressure values, switching times, guide backlash, and minimum operating pressure are checked before and after the test and at cyclical intervals during the test.  Testing is stopped as soon as either a total failure has taken place or certain limits for defined characteristic values are exceeded, even though the product is fundamentally still capable of operating (tolerance failure).



Festo has been carrying out long-term testing for over 30 years.  “We currently have around 1,500 items on test at the same time. We store the resulting data on our service-life database, which contains detailed information on over 20,000 test items.”   


 www.festo.com


: Design World :

Filed Under: Components

Primary Sidebar

Fluid Power World Digital Edition

Fluid Power World Digital EditionBrowse the most current issue of Fluid Power World and back issues in an easy to use high quality format. Bookmark, share and interact with the leading design engineering magazine today.

RSS Featured White Papers

  • eBook: Practical Guide to Pneumatics
  • Saving energy and service cost with electric linear systems
  • White Paper-How to Design Efficient Pneumatic Systems!

Fluid Power Design Guides

fluid
“pt
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for Fluid Power Professionals.
Hose Assembly Tips

Footer

Pneumatic Tips

Fluid Power World Network

  • Fluid Power World
  • Hose Assembly Tips
  • Mobile Hydraulic Tips
  • Sealing and Contamination Tips
  • Fluid Power Distributor Lookup

PNEUMATIC TIPS

  • Subscribe to our newsletter
  • Advertise with us
  • Contact us
  • About us

Copyright © 2026 · WTWH Media LLC and its licensors. All rights reserved.
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media.

Privacy Policy