• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Pneumatic Tips

Tips, Trends, Resources, News and Information

  • Pneumatics Blog
  • Industry News
  • Air Preparation
  • Engineering Basics
  • Equipment
    • Actuators
    • Cylinders
    • Fittings
    • Gears
    • Grippers
    • Pumps
    • Air Compressors
    • Tubing
    • Vacuums
    • Valves
  • Pressure Sensing
  • Suppliers
  • Videos
You are here: Home / Air Preparation / Compressed air fail: School of hard knocks

Compressed air fail: School of hard knocks

December 11, 2019 By Paul Heney Leave a Comment

Share
This compressor wasted $4,000 per year for 12 years!

A technical high school had to replace its 12-year-old lubricated screw air compressor after 100,000 hours of operation. The unit had simply worn out after many hours of operation.

The school maintenance staff was unaware that some screw compressors, if installed with very little storage, will run unloaded continuously, consuming significant power but producing no air. This 15-hp unit ran constantly for more than 10 years, never shutting off except briefly for maintenance intervals.

The school only operates its shops for six hours per day, five days per week over 10 months of the year. This calculates out to only about 1,200 hours per year. However, the actual annual operation of this unit was more than 8,000 per year. The compressor was loaded about 2% of the time and consumed 5 kW when unloaded, so the wasted energy calculated to a cost of roughly $4,000 every year. Through the life of the compressor, about $48,000 worth of energy was wasted. The maintenance supervisor was surprised and said he had learned something he did not know — this proved to be a very expensive lesson.

A better choice would have been a compressor that was rated for start/stop operation or VSD control that would consume no unloaded power. A similar sized compressor running for 1,200 hours (with the unit being shut down at night) would consume about $100 worth of electricity per year in the expected 24 annual hours of loaded run time. And this solution is exactly what the school has done now. They have learned their lesson well.

 

 

Filed Under: Air Preparation

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

 

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Primary Sidebar

Fluid Power World Digital Edition

Fluid Power World Digital EditionBrowse the most current issue of Fluid Power World and back issues in an easy to use high quality format. Bookmark, share and interact with the leading design engineering magazine today.

Design Guides

Pneumatic Actuators Design Guide

Pneumatic Actuators Design Guide

Hydraulic Cylinders Design Guide

RSS Featured White Papers

  • eBook: Practical Guide to Pneumatics
  • Saving energy and service cost with electric linear systems
  • White Paper-How to Design Efficient Pneumatic Systems!
Subscribe Today
Hose Assembly Tips

Follow Paul on Twitter

Tweets by @DW_Editor

Follow Mary on Twitter

Tweets by @DW_MaryGannon

Footer

Pneumatic Tips

Fluid Power World Network

  • Fluid Power World
  • Hose Assembly Tips
  • Mobile Hydraulic Tips
  • Sealing and Contamination Tips
  • Fluid Power Distributor Lookup

PNEUMATIC TIPS

  • Subscribe to our newsletter
  • Advertise with us
  • Contact us
  • About us
Follow us on Twitter  Add us on Facebook  Follow us on LinkedIn  Follow us on YouTube  Follow us on Instagram

Copyright © 2021 · WTWH Media LLC and its licensors. All rights reserved.
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media.

Privacy Policy